Featured Wood Boiler Installation: Solo Plus 60

solo plus 60 boiler installation

Installed by: John Abbott Enterprises, Inc, Center Barnstead, NH (603) 269-2843
Completion Date: December 2008
Goal: To heat a large commercial space with wood utilizing a larger storage tank.
New Renewable System Installed Wood Gasification
Boiler: Scandtec Solo Plus 60 with 1000 gallons of storage.
solo plus 60 boiler installation IMG_1634
IMG_1635 IMG_1665

WANT MORE?

SIGN UP TO RECEIVE THE LATEST TARM BIOMASS BLOG POSTS.

We don’t spam! Read our privacy policy for more info.

Leave a Reply

Your email address will not be published. Required fields are marked *