Featured Installation: Fröling P4 Fully Automatic Pellet Boiler

commercial pellet boilers

Systems Installed: One P4 32/38 wood pellet boiler with 400 gallons of thermal storage.
An external silo will be used for fuel storage.
Installation Date: Winter 2012  Completed Date: Late 2012
Installed By: Advanced Heating Technologies 802-763-2200

Older warehouse building, located in Bethel, Vermont. Renovation began in winter 2012. Boiler installed early to provide heat for renovation.

Froling P4 Bethel 1

Froling P4 Bethel 2

Froling P4 Bethel 3

close

WANT MORE?

SIGN UP TO RECEIVE THE LATEST TARM BIOMASS BLOG POSTS.

We don’t spam! Read our privacy policy for more info.

Leave a Reply

Your email address will not be published. Required fields are marked *