Announcing The Fröling Turbomat 500

Posted Leave a commentPosted in Commercial Boiler Images, Fröling TM 500, Fröling TM 500 Installations, Installations, News Articles, Pictures, Stories

The first Fröling Turbomat 500 (TM 500) has arrived in the USA! The TM 500 is a 1.7 mm Btu/hr. boiler capable of burning wood chips up to 45% moisture content or wood pellets. The boiler weighs over 18,000 pounds, in large part due to its heavily bricked firebox, which is necessary for wetter wood […]

Fröling T4 Installation-Proctor Elementary, Proctor, Vermont

Posted Leave a commentPosted in Commercial Boiler Images, Fröling T4, Fröling T4 Installations, Installations, Pictures, Products, Stories

The Fröling T4 is the newest boiler to our lineup. The T4 is a commercial or institutional ASME-rated boiler that will burn both wood pellets or dry wood chips. 500,000 BTU/hr ASME Pressure Vessel Fully Automatic Wide range of fuel feed systems The Proctor Elementary School is approximately a 60,000 sq. ft. building that originally […]

Featured P4 Pellet Boiler Installation-The First Congregational Church in Thetford, VT

Posted Leave a commentPosted in Commercial Boiler Images, Installations, P4 Pellet Boiler Installations, Pictures, Wood Pellet Boiler Images

Equipment: Fröling P4 48/60 with a 400-gallon storage tank and auger vacuum system. Building: Church and Day Care Center. The church was built in 1787. System Installed by: Roger Carpenter Services 5551 Route 5 Thetford, VT 802.333.7171 It was time to update the heating system in the 226-year-old church. The church has a long history […]